Testing, adjusting and balancing
We measure air and water flow at every grille, fan and pump, then set dampers and valves until each reading matches the design flow.
Request a test date
What balancing proves
A system can run while delivering the wrong flow to individual rooms, with some branches oversupplied and others short, so the fans and pumps work harder to compensate.
We measure flow at every grille, fan and pump, then set the dampers and valves until each reading is within tolerance, and the report lists every final reading beside its design value.
Balance once the system is running
Balancing needs the full system on, with ductwork tested, fans and pumps started and controls working, since flows set any earlier will move.
Equipment started
Balancing
Controls tuned
Commissioning
Handover
Before we arrive
Send this list to your site team so every system is ready to balance when we arrive.
System complete and running
Fans, pumps and controls run in normal mode, with clean filters fitted.
Dampers and valves fitted
Volume dampers and balancing valves are installed, open and within reach.
Drawings and flow schedule
The latest drawings, with the design flow for every grille, terminal, fan and pump.
Access to every terminal
Removable ceiling tiles, with ladders or scaffold for high-level outlets.
Controls engineer on call
Available to change fan speeds and override controls during balancing.
What the report includes
Every test ends with a signed report that's ready to attach to the commissioning record, and your commissioning agent gets the same copy you do.
Ask for a sample reportTesting and balancing report
- 1Systems, drawings and design flow schedule
- 2Instruments, serial numbers and calibration dates
- 3Design and measured flow at every terminal
- 4Fan and pump flow, pressure, speed and power
- 5Final damper and valve settings
- 6Issues found and how each was resolved
- 7Signatures of the tester and witnesses
Testing and balancing on 13 projects
See all 13Hyperscale data center
Cikarang and Karawang
TAB on the data hall air handling units
In progress
Hyperscale data center
Cikarang, phase 2, building 3
Duct leakage and TAB
In progress
Data center
Batam
TAB, duct leakage, room integrity and mechanical testing, plus commissioning and QC management
In progress
Colocation data center
Tangerang
TAB, duct leakage, room integrity, mechanical and electrical testing, plus commissioning management
Finished
Questions contractors ask
What if a terminal cannot reach its design flow?
We record the shortfall and trace its cause, such as an undersized branch or a fan short of duty, then recommend a remedy, and the report always shows the reading as measured.
Which procedure do you follow?
The NEBB procedural standards, or the procedure named in your specification, and we confirm it with the tolerances before the first visit.
Do you balance water systems too?
Yes, we measure chilled water flow at pumps, coils and balancing valves, and set the valves to the design rates.
How long does balancing take?
It depends on the number of terminals and how ready the system is. Once we have seen the drawings and flow schedule, we give you an estimate.
Book testing and balancing
Send the drawings, the flow schedule and your target dates, and we'll reply with a test plan and a quote.