Pariksa Cipta Solution tests ductwork, protected rooms, cooling plant and power systems on data center sites across Indonesia, and every test ends with a signed report your commissioning team can file.
We seal each duct section, pressurise it with a calibrated fan and measure how much air escapes at the test pressure in your specification. Sections that fail are found, fixed and retested while the scaffold is still up.
In rooms protected by clean-agent or inert-gas suppression, a door fan test measures how leaky the room is and predicts whether the agent will hold its concentration for the full hold time.
We measure airflow and water flow at terminals, coils and pumps, set the dampers and valves, and balance each system to the design flow rates on the approved drawings.
We run chillers, CRAH units, pumps and fans at each load step and measure capacity, flow, pressure and power against the equipment schedule and the manufacturer's data.
We test insulation, earthing and protection while the system is dead, then run generators and UPS systems on load banks and time every breaker and relay against its setting.
The name comes from the Sanskrit parīkṣā, and it describes the job: proving that ductwork, rooms, plant and power systems perform before anyone signs for them.
We set up PT. Pariksa Cipta Solution in 2025 as an Indonesian MEP testing company that works for contractors, commissioning agents and building owners.
Questions we get before every quote
Do we need every test, or just one?
Only the ones your specification calls for, since each test is quoted and booked on its own. You can bring us in for duct leakage now and for room integrity once the room is sealed.
Which standards do you test against?
SMACNA for duct leakage, ISO 14520 and NFPA 2001 for room integrity, and ASHRAE Standard 111 for testing, adjusting and balancing, while mechanical and electrical tests follow your approved test scripts and specification. If your specification names another method, we test to that and write it into the quote.
When should we bring you in?
Duct leakage tests happen before the ceiling closes, while every section can still be reached, and room integrity tests once the room is sealed and the doors are hung. Testing and balancing starts when the systems run on permanent power, electrical insulation and protection tests happen before the system is energised, and mechanical tests follow once each unit has been started.
What do we receive at the end?
A signed report for each test, with the measured results against the target in your specification, photos of each test setup and a pass or fail for every section, room, unit or system, and your commissioning agent gets the same copy.
What do you need from us on site?
We need safe access to the area, power for our equipment and someone from your team who can isolate systems and fix anything that fails, and each service page lists what to have ready before we arrive.
Where do you work?
On data center and critical facility sites across Indonesia, so tell us where the project is when you ask for a quote.
Tell us what needs testing
Share the building, the systems and your target dates, and we'll reply with a test plan and a quote.