Skip to content

The testing behind a clean handover.

Pariksa Cipta Solution tests ductwork, protected rooms, cooling plant and power systems on data center sites across Indonesia, and each test ends with a signed report ready for your commissioning record.

Request a test date
Duct pressure test on a foil-wrapped battery room air handling unit, with a Pariksa engineer at the rig.

Tests we run on site

We bring the test rig, run each test witnessed by your contractor and commissioning agent, and record a pass or fail for every section before we leave.

The Pariksa team around the yellow test fan, reading results during a duct leakage test.

Duct leakage testing

We seal each duct section, pressurise it with a calibrated fan and measure how much air escapes at the test pressure in your specification. Sections that fail are found, fixed and retested while the scaffold is still up.

How this test works

Room integrity testing

In rooms protected by clean-agent or inert-gas suppression, a door fan test measures the room's leakage and predicts whether the agent will hold its concentration for the full hold time.

How this test works

Mechanical testing

We run chillers, CRAH units, pumps and fans at each load step and measure capacity, flow, pressure and power against the equipment schedule and the manufacturer's data.

How this test works

Electrical testing

We test insulation, earthing and protection while the system is dead, then run generators and UPS systems on load banks and time every breaker and relay against its setting.

How this test works

Recent work on data center sites

25 projects at 19 data centers

See all 25 projects

About Pariksa Cipta Solution

Pariksa comes from the Sanskrit parīkṣā, meaning examination, and describes our work: proving that ductwork, rooms, plant and power systems perform before they are handed over.

We set up PT. Pariksa Cipta Solution in 2025 as an Indonesian MEP testing company that works for contractors, commissioning agents and building owners.

Common questions before a quote

Do we need to book every test?

Only the ones your specification calls for, since each test is quoted and booked on its own. You can book duct leakage now and room integrity once the room is sealed.

Which standards do you test against?

DW/143 for duct leakage, NFPA 2001 for room integrity, and the NEBB procedural standards for testing, adjusting and balancing, while mechanical and electrical tests follow your approved test scripts and specification. If your specification names another method, we test to that and write it into the quote.

When should each test be scheduled?

Duct leakage tests happen before the ceiling closes, while every section can still be reached, and room integrity tests once the room is sealed and the doors are hung. Testing and balancing starts when the systems run on permanent power, electrical insulation and protection tests happen before the system is energised, and mechanical tests follow once each unit has been started.

What do we receive at the end?

A signed report for each test, with the measured results against the target in your specification, photos of each test setup and a pass or fail for every section, room, unit or system, and your commissioning agent gets the same copy.

What do you need from us on site?

We need safe access to the area, power for our equipment and someone from your team who can isolate systems and fix anything that fails, and each service page lists what to have ready before we arrive.

Where do you work?

On data center and critical facility sites across Indonesia, so include the project location in your quote request.

Tell us what needs testing

Share the building, the systems and your target dates, and we'll reply with a test plan and a quote.

[email protected]
What needs testing

This opens your email app with the request filled in, addressed to [email protected].