Mechanical testing
We run chillers, CRAH units, pumps and fans at each load step and measure their output to confirm every unit meets its design duty before handover.
Request a test date
What the test proves
A chiller or CRAH unit can start, run and show no alarms while still falling short of the capacity it was selected for, and in a data hall that shortfall shows up on the hottest day, with the IT load at its peak.
We run each unit at the load steps in the test script and record temperatures, flows, pressures and power, then compare every reading with the equipment schedule and the manufacturer's data to pass or fail the unit.
What we test
These are the units and checks the test scripts usually cover, and your scripts set the exact steps.
Chillers
Capacity and efficiency at each load step
CRAH and CRAC units
Cooling capacity, airflow and fan power
Air handling units
Airflow, coil duty and pressure drop
Pumps
Flow, head and power against the pump curve
Fans
Airflow, pressure and power against the fan curve
Duty and standby
Units swap over and restart as designed
Safeties and alarms
Trips and interlocks respond as designed
Condition after the run
Noise, vibration and temperatures checked
Test each unit before integrated testing
Integrated testing assumes every chiller, CRAH unit and pump already meets its duty, so a unit that falls short at that stage delays the whole programme.
Start-up
Performance test
Defects closed
Integrated testing
Handover
Before we arrive
Send this list to your site team so every unit is ready to test when we arrive.
Start-up signed off
Each unit has been started by its manufacturer, with no open alarms.
Heat load in place
Load banks or a real heat load, enough to run each unit at every step.
Test scripts approved
Scripts, schedules and manufacturer's data, approved by your commissioning agent.
Controls engineer on call
An engineer who can change setpoints and override controls during the tests.
Access and witnesses
Safe access to each unit, and your commissioning agent invited to witness.
What the report includes
Every test ends with a signed report that's ready to attach to the commissioning record, and your commissioning agent gets the same copy you do.
Ask for a sample reportMechanical test report
- 1Units tested, with an equipment schedule extract
- 2Test scripts and load steps
- 3Capacity, flow, pressure and power at each step
- 4Results against design and manufacturer's data
- 5Punch list of anything that did not pass
- 6Equipment serial numbers and calibration dates
- 7Signatures of the tester and witnesses
Mechanical tests on 7 projects
See all 7Colocation data center
Jakarta, phase 1
Mechanical testing
In progress
Colocation data center
Jakarta, phase 2
Mechanical testing
In progress
Data center
Batam
TAB, duct leakage, room integrity and mechanical testing, plus commissioning and QC management
In progress
Colocation data center
Tangerang
TAB, duct leakage, room integrity, mechanical and electrical testing, plus commissioning management
Finished
Questions contractors ask
Which equipment do you test?
Chillers, CRAH and CRAC units, air handling units, pumps and fans, and any other unit with a design duty on the equipment schedule, since that duty is what we test it against.
Where does the heat load come from?
A new data hall has no IT load yet, so the test runs on temporary load banks, and the test plan says how much load each step needs.
What if a unit falls short?
We record the readings, check the setup with the manufacturer's engineer and add the unit to the punch list, then retest it once it is fixed.
How long does it take?
It depends on the number of units and load steps. Once we have the equipment schedule and the scripts, the test plan gives you an estimate.
Book mechanical testing
Send the equipment schedule, the test scripts and your target dates, and we'll reply with a test plan and a quote.